Dan the Handyman - Carpenter, Decorator, Handyman E5, N16, E10, E11, E17
Home
Portfolio 1
Portfolio 2
Reviews
Prices
Contact
T's & C's
Decking and ballastrade March 2008
Decinkg and ballastrade
Bridge&sluice gate to over private lake and stream(August/Sept 2009)
Bridge with sluice gate(footings)
2nd phase of bridge
final phase(completion)of bridge
Small garden nature pond (July 2009)
Make and fit twin Barn doors on a 17th Century Barn(Oct 2009)
completed doors(prior to painting)
completed doors,with cast iron hinges
Mini duck pond and cascading waterfall(July 2006)
cascading water(1 month after completion)
Woodland style path and corner
.
Bark chip pathway with stepped log-edge
The Woodland corner.
A-frame Blackboards
March 2010
Washing machine cupboard and shelving,with double-hinged door.(April 2010)
Kitchen cutlery and utensils holdal(to fit into a standard drawer). May 2010
Re-paint all fascias and soffets. May 2010
before
after
Remove twin-folding cupboard doors, re-hang with hinges to open from centre.
June 2010
folding doors(before)
hinged doors(after)
Windows (wetrot)repaired and re-painted(Prep/paint all fascias,soffets,gutters and windows to 8 2 story flats) .July-August 2010.
center panel of window
Corner of window
Front driveway conversion.Stone footpath with honeycombe
driveway/lawn blocks.August 2010
Driveway before(looking sideways,along driveway)
Driveway before(looking towards house)
Footpath,constructed from: Indian sandstone paving,with block edging.
completed driveway(honeycombe-style turf blocks are sat level with soil)
2nd view of completed works.
Final photo showing fully grown lawn(and being used as grass driveway),to follow shortly.
Conversion of existing front lawn into a Gravel driveway. October 2010
Before(looking toward bungalow)
Before(looking out towards drive entrance)
During(showing weed control fabric)
The completed driveway.
Concrete Pathway,step and soak-aways. October 2010
Before
After
Before
After (reverse angle)
before
Showing Step.slab for bins),and soak-away
Front Pathway
Showing path round to front door and sloping path to right.
Tiled splash-back above Kitchen Hob .October 2010
Barkchip flowerbeds
,with Lavender plants.
November 2010
Replace rotten gable-end shiplap. Nov 2010.
Before
After
Kitchen Re-furbishment Feb 2011(phase 2-tiling/repaint due April '11)
Before
After
Shed door replacement(new door handbuilt by myself).March 2011
Duckhouse. March 2011.
Before
After
Japanese
-style Bridge. March 2011.
Before
After
(19th Century)Window repair. March 2011.
Before
After
Decking extension. April 2011.
Horse-mounting steps.April 2011.
6x3m Decking.May 2011.
Chest of drawers re-paint May 2011.
Floor Tiling